Hello my name is Kristen and I am about 1 month behind on my life. Life keeps going all around me and I get further and further behind, hence the giant lapse in blogging.
But hey I’m here today, so let’s take a look at what has been going on. These pictures were actually taken a week ago, so I’m going to go back in time a week to tell you our progress.
The contractor started work on Bella’s bedroom and bathroom. The first few weeks were hit and miss with our family being sick, and the contractor having his own issues. When he was here, he was working on things like plumbing and laying subfloor. Those activities don’t lead to particularly good pictures. The past week he started hanging sheetrock.
Here is where it looks now.
Looking from the hallway into Bella’s bedroom.
Looking at the shower portion of the bathroom. If you look closely you can see the floor is lowered so that once the shower floor and concrete get installed it will be flush and a true “roll-in” shower.
Looking straight into the bathroom where the vanity and toilet will be.
Looking to the left where the walk-in closet will be.
Also as part of this project we are going to updating the hall bathroom, so it’s been stripped down and ready for new tile and paint.
And as far as our Master bathroom goes, we are currently able to use the shower and the sinks…and low and behold we finally have a toilet installed. But it’s quite a mess as we have a lot of additional things to get installed/purchased.
I will give you a hint and tell you the hubby was productive this past weekend, and our bathroom is looking a lot better….pictures to come….you know…at some point!